MBA News | MBA Jobs | MBA Students | MBA Aspirants | MBA Forums
--- CoolAvenues.Com ---
Home    |     MBA Jobs     |     Knowledge Zone     |     Seminars     |     Placement Report     |     Admission Alert      |   MBA Forums
CAT/ MAT/ XAT/ JMET    | CAT 2009    |   Executive MBA    |   GMAT    |   Help Line    |   Online MBA Help   |   Buy/Sell    |   Cafe   |   Gadgets  

CoolAvenues MBA Details
Page title
Join CoolAvenues on
Facebook Twitter Orkut

Go Back   MBA Forums :: CoolAvenues.com > Classifieds > Freelance - Projects , Assignments, Consulting

Reply
 
Thread Tools Rate Thread Display Modes
Old 05-13-2012   #1
raj_sree216
Visitor
 
Join Date: May 2012
Institute : MBA Bsiness school
Company : consulting
Location: Chennai
Posts: 0
Thanks: 0
Thanked 0 Times in 0 Posts
Default Make-or-Buy Decision problems in SCM

Hi MBA Gurus,

I am new to this forum and doing part-time MBA. Currently I am doing SCM subject and struggling in Make or Buy scenario/ problems. Can anyone please help me to solve this problem or case below:

Alex Daniel was procurement manager for the mid-west division of the Terpend Corp. Shortly before his company was to install an exhaust system in a new construction project, Alex was asked to compare fabricating the pipe with purchasing the pipe from an outside source.

Terpend Corporation, a mechanical and sheet metal contract, was founded over 50 years ago. Although it had a number of branches in North America, the majority of its metal fabrication work was performed in its Midwest facility. The company mission stressed quality workmanship, competitive pricing, and timely performance.

A LABORATORY EXHAUST SYSTEM
Terpend recently was awarded the bid to provide the HVAC system in a corporate headquarters building that housed a research laboratory. This was a complex project with many nonstandard features due to the specialized use of the building.
The system included a need for over 6500 feet of 10-inch diameter, 16-gauge stainless steel pipe. This piping would be used for venting the laboratory exhaust. When the cost estimation department at Terpend prepared the original bid, they had planned to fabricate this pipe at their Midwest facility.

A REQUEST FOR COST REDUCTION
As the project got underway, the VP of Operations asked Alex Daniel “if it would be possible to provide the stainless steel pipe at a lower cost than the original estimate.” Alex knew, of course, that any reduction in cost must not come at a sacrifice of quality. Because of toxins that would be present in the laboratory exhaust, it was critical that his system be absolutely leak proof. Every pipe run would be individually tested to insure integrity. If leaks were uncovered in the welds, it would require a time-consuming effort to reweld the joints on-site.
Alex realized that there were two approaches to providing the pipe. Terpend could proceed as planned and fabricate the pipe in-house, using the lowest-cost, acceptable quality steel available on the market. The second possibility would be to find a supplier who could provide the pipe already formed at a better cost.

THE PURCHASE OPTION
Alex first explored the purchase option. He did a thorough search of the market, and found that most suppliers were asking from 23 to 28 dollars per linear foot (delivered) for 10-inch-diameter, 16-gauge stainless steel pipe. He was pleasantly surprised, however, to find a supplier who would provide the pipe for $18.10 per linear foot. These suppliers provided the pipe in 20-foot sections and guaranteed the pipe to be sound (no leaks). In addition, their pipe was “perfectly” true (round), a trait that Terpend’s current equipment could not always provide. This feature would reduce the time needed to make connections between sections of pipe and reduce the likelihood of bad weld joints.
Although this option sounded very attractive, Alex, a veteran in the purchasing area with 14 years of experience, knew he would have to subject his options to a thorough analysis to ensure a wise decision.

THE MAKE OPTION
Alex had access to the data necessary for manufacturing cost estimating. He knew that the process of making pipe required two steps. First, a flat sheet of steel is formed into a cylinder through the process of “rolling.” Then the seam is joined in a welding process. For a 10-inch-diameter pipe of 16-gauge steel, it takes about six minutes per piece to roll, including loading and unloading the part. The equipment Terpend had available for this process could roll lengths up to eight feet. The welding process was estimated to take ten minutes for an eight-foot section. The figure the company used for cost estimating purposes for hourly labor rate was $32.60 per hour. An overhead charge of 40 percent was added to the variable costs.
Stainless steel sheets were available in 36-inch, 48-inch, and 60-inch widths at any length up to 10 feet, with the best price being $1.80 per pound. A square foot of 16-gauge steel weighs two and one-half pounds. The welding process required welding wire and welding gas. Welding wire cost around $5.20 per pound and .03 pounds were needed per foot of weld. Welding gas cost around 25 cents per eight-foot seam.

Many of the lengths of pipe needed in the project were longer than eight feet. Thus, Alex thought it necessary to include the cost of an extra joint (which, for example, would make two eight-foot lengths into one sixteen-foot length) in the “make in-house” alternative. Such a joint required welding around the diameter of the pipe, a process that, with setup, would take around 18 minutes per joint.

Alex wondered which option would be best. Should Alex recommend purchasing the pipe or making it?
• Write a 2-page case analysis along with your assumptions and calculations.
raj_sree216 is offline   Reply With Quote
Reply

Bookmarks

Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Top 5 GMAT Study Tips 2newgmat GMAT & MBA abroad Help Line! 1 02-05-2011 11:48 AM
Zodiac Signs Soo True aries- libra nanhis Open House 25 11-19-2010 04:50 PM
help me 2 make decision.. aspan22 Management Career Discussion Zone 2 11-29-2008 12:02 AM
9 ways to make Great Decisions nikhu22 HR Zone 0 11-04-2008 04:39 PM
Decision Support System Help sonia_tiwari Assignments projects for Correspondence / Part Time / Online / Evening MBA Students 5 01-15-2008 11:24 AM

MBA Jobs
MBA Preparation
B-Schools
MBA Forums
About CoolAvenues
Senior Mgmt Jobs CAT / MAT/ CET Dean talk CAT Preparation Post a Job
Finance Jobs Admission Alert B-School Profile Executive MBA Advertise with Us
Marketing Jobs MBA Insider B-School Diary Career Help Contact us
HR MBA Jobs MBA Admission Process Summer GMAT Privacy
Operations MBA Jobs English Preparation MBA News Companies Copyrights
IT MBA Jobs GMAT MBA Events B-Schools About CoolAenues
Consulting MBA Jobs CAT / MAT / CET test papers MBA Placements Summer Guidance
Resume Design Tips MBA in India Summers Guide Classifieds
All times are GMT +5.5. The time now is 04:26 AM.


Latest Discussion
Latest Active Threads


Powered by vBulletin® Version 3.8.1
Copyright ©2000 - 2013, Jelsoft Enterprises Ltd.
Copyright 2006-2015 Zebra Networks

CoolAvenues.com message boards are designed for a community of insiders and observers. CoolAvenues.com reserve the right to delete or modify off-topic posts or posts that violate the Rules of the Board. The opinions expressed on CoolAvenues.com Message Boards reflect the opinions of the participants and not of CoolAvenues.com

© CoolAvenues logo & design template are exclusive copyright of Zebra Networks 2004-20012
© All copyrights with Zebra Networks. Part or full of the contents can not be published, copied or reproduced
in any form without the prior written exclusive permission of Zebra Networks. Pls refer to CoolAvenues Copyright section.